Enlisted on 06/27/1988.. United States Army Reserves – [USAR].. Co. B. 871st. Engineer Bn.. San Antonio, Texas..
Order # 190 – 056 to 18 weeks at San Antonio, Texas.. Reported 09/27/1988 to 10/25/1988.. This is all Reserve time..
R
eported for Active Duty on 10/25/1988 with 43rd.. AG Bn.. (Reg) Fort Leonardwood, Mo..
10/31/1988 – ?? Bn.. 10th.. Infantry Regt.. – USAEC – Fort Leonardwood, Mo..
01/12/1989 – AIT – 87th.. Engineer Bn.. 1st. Engineer Bgde.. – USAEC – Fort Leonardwood, Mo..
03/10/1989 – Released from Active Duty and returned to Reserve Unit of Assignment..
03/11/1989 – Heavy Construction Equipment Operator – Co.. B.. 871st.. Engineer Bn.. San Antonio, Texas..
Total Reserve and Active Duty time is between 9 and 10 months..